What’s New

What’s New

Sl. No. Title Date Download/View Details
1 Report of Committee on Formulation of Trajectory of Indigenisation of SCADA System. 2026-08-24
2 Cyber Security Regulations 2026-08-12
3 “Notice of Result–Appointment to the post of Multi-Tasking Staff of General Central Service on compassionate grounds” 2026-08-10
4 Draft Central Electricity Authority (Technical Standards for Connectivity to the Grid) Regulations, 2026- Invitation of Public Comments. 2026-08-04
5 CEA advisory to Transmission Utilities for adoption of New Technology options in forest area as prescribed in the Schedule VII of the CEA (Technical Standards for Construction of Electrical Plants and Electric Lines) Amendment Regulations, 2025 to reduce RoW (30.07.2026) 2026-07-30
6 Compendium of Definitions contained in the Electricity Act, 2003, Rules notified by the Ministry of Power, CEA Regulations and CERC Regulations 2026-07-30
7 Chariperson CEA addresses 2026-07-17
8 Monthly Installed Capacity Report as on 30.06.2026 2026-07-15
9 Hydro Power in India: CEA’s Perspective- Keynote address by Chairpeson Shri Ghanshyam Prasad 2026-07-12
10 Message on Electrical Safety 2026-07-08
11 Advisory on safe and judicious use of electricity in view of El Niño conditions or otherwise 2026-07-08
12 Guidelines on advanced methodologies for adoption during investigation, tender and construction stages of hydel projects for minimizing geological uncertainties in long water conductor systems 2026-06-29
13 Report of the National Workshop on RE integration through ESS Phase-II 2026-06-29
14 “Notice for Filling up One (01) Vacancy of Despatch Rider on a Deputation Basis in CEA.” 2026-06-25
15 “Notice for Filling up One (01) Vacancy Each of Stenographer Grade-I and Private Secretary on a Deputation Basis in the Subordinate Offices of CEA.” 2026-06-19
16 Inviting comments/suggestions from stakeholders on the draft “Compendium of Definitions 2026-06-18
17 General Implementation timelines for Inter-State Transmission System (ISTS) projects 2026-06-12
18 Monthly Installed Capacity Report as on 31.05.2026 2026-06-12
19 Extension of last date for submitting comments on Amendment-II to the Manual on Transmission Planning Criteria, 2023. 2026-06-09
20 Advisory on use of Ester Oil as a Technological Option in Transformers 2026-05-21
21 Notice inviting suggestions comments on Amendment-II to the Central Electricity Authority (Manual on Transmission Planning Criteria), 2023. 2026-05-19
22 Standard Technical Specifications For Single-Phase And Three-Phase CRGO Core Distribution Transformers (Part-I) 2026-05-15
23 Report on Workshop on the “SHANTI Act, 2025: Enabling India’s 100 GW Nuclear Power Roadmap through Public–Private Partnership” 2026-05-15
24 Need for national framework for Rationalizing Fixed Charges and Tariff Redesign 2026-05-14
25 Monthly Installed Capacity Report as on 30.04.2026 2026-05-14
26 Report of the Committee on addressing Insulator Failure on Transmission Line (May, 2026) 2026-05-05
27 “Inviting comments on draft recruitment rules for the post of Library & Information Assistant, CEA” 2026-05-04
28 Workshop of Shanti Act 2025: Enabling India’s 100 GW Nuclear Power Roadmap 2026-04-28
29 National Workshop on RE integration through ESS Phase-II to be held on 30.04.2026 in hybrid mode 2026-04-21
30 Monthly Installed Capacity Report as on 31.03.2026 2026-04-20
31 Notice of Result–2024 for appointment to one post of Canteen Attendant in the Departmental Canteen, CEA 2026-04-20
32 Notice of Result–2023 for appointment to one post of Canteen Attendant in the Departmental Canteen, CEA 2026-04-20
33 Report of the Committee on the Use of Green GIS Technology in the Indian Grid 2026-04-13
34 ENGAGEMENT OF GRADUATE/DIPLOMA APPRENTICES TRAINEES (ENGINEERING) AS PER THE APPRENTICES ACT, 1961 2026-04-13
35 Long Term National Resource Adequacy Plan (2026-27 to 2035-36) 2026-04-08
36 “Ash Generation and Utilization at Coal/Liginite-Based Grid-Connected Thermal Power Stations for the Year 2024-25” 2026-03-23
37 Transmission Plan for Integration of over 900 GW Non-Fossil Fuel Capacity by 2035-36 2026-03-23
38 National Generation Adequacy Plan( 2026-27 to 2035-36) 2026-03-19
39 Clarification on Acceptance of In-House Type Testing of any Electrical Equipment/Material in NABL-Accredited Laboratories as per clause 3(d) of CEA’s Type Test Guidelines 2026-03-19
40 Monthly Installed Capacity Report as on 28.02.2026 2026-03-13
41 Invitation of public comment on Draft Central Electricity Authority (Installation and Operation of Meters) Amendment Regulations, 2026, last date of submission – 26.03.2026 2026-02-23
42 Draft Report of the Committee on Wear & Tear, O&M and Plant Lifespan Implications due to flexible operation 2026-02-18
43 Monthly Installed Capacity Report as on 31.01.2026 2026-02-12
44 Manufacturing Capacity of Grid Forming Inverters in India 2026-02-03
45 Notice Inviting Applications for the Post of Despatch Rider on Deputation Basis from Regular MTS of CEA 2026-01-30
46 Compliance of CEA “Standard Specifications and Technical Parameters for Transformers and Reactors (66 kV & above voltage class)” 2026-01-30
47 Report on Roadmap to 100 GW of Hydro Pumped Storage Projects 2026-01-28
48 Monthly Installed Capacity Report as on 31.12.2025 2026-01-20
49 Guidelines for Model Quality Assurance Plan (MQAP) for Major Equipment of Power Sector 2026-01-19
50 Guidelines for the Type Tests for Major Equipment of Power Sector 2026-01-19
51 Issuance of revised “Guidelines for the Type Tests for Major Equipment of Power Sector” and “Guidelines for Model Quality Assurance Plan (MQAP) for Major Equipment of Power Sector” 2026-01-19
52 Invitation of comments on draft Technology Catalogue by 15.02.2026 2026-01-13
53 All India Electricity Statistics – General Review 2025 2026-01-06
54 GROWTH OF ELECTRICITY SECTOR IN INDIA FROM 1947- 2025 2026-01-06
55 Monthly Installed Capacity Report as on 30.11.2025 2025-12-24
56 Concept note on revenue certainty & Tax incidence during Monetization of Transmission Asset 2025-12-22
57 Request for Proposals for Research and Development in the Power Sector – reg. 2025-12-22
58 Submission of information regarding identified critical items those are currently being imported and support required for their localisation- reg. 2025-12-12
59 “Inviting Public Comments on draft Standard Operating Procedure (SOP) for Independent Third-Party Fire Safety Audit of Battery Energy Storage System (BESS)” 2025-12-12
60 Notice of result for appointment to one post of canteen attendant and one post of canteen clerk in the Departmental Canteen, CEA 2025-12-10
61 Minutes of Meeting held under chairmanship of CE (ET&I) on Distribution Tranformers dated 29-10-2025. 2025-11-17
62 Draft Guidelines for Tariff Based Competitive Bidding Process for Procurement of Power from Grid Connected Waste to Energy Projects prepared 2025-11-13
63 Concept note on revenue certainty & Tax incidence during Monetization of Transmission Asset 2025-11-07
64 Corrigendum w.r.t. Technical parameters of 400/132 kV, 315 MVA, 3-Phase Auto Transformer specified in CEA’s “Standard Specifications and Technical Parameters for Transformers and Reactors (66 kV and above)” 2025-10-24
65 Minutes of the meeting of Standing Committee of Experts on failure of EHV transmission towers failed during the period from January 2025 to June 2025 2025-10-17
66 Master Plan for Evacuation of Power from Hydroelectric Plants in the Brahmaputra Basin 2025-10-13
67 Details report of webinar held on Advanced Solar cell technology along with enclosed PPT. 2025-10-13
68 Minutes of the meeting of the Standing Committee of the Experts to discuss the failure of 220 kV and above voltage level Transformers during period of January, 2025 to June, 2025 2025-10-08
69 Draft Central Electricity Authority (Technical Standards for Construction of Electrical Plants and Electric Lines) (2nd Amendment) Regulations, 2025-Invitation of Public Comments. 2025-10-06
70 Draft Central Electricity Authority (Cyber Security in Power Sector) Regulations, 2025- Invitation of Public Comments. 2025-10-06
71 Issue and measures taken to improve the quality of power sector equipment and installation -reg 2025-10-03
72 Identification of Unit(s) of a generating station for captive purpose owned by SPV (As per rule 3(1)(b) of Electricity Rule 2005 and para 6.8(i) of captive procedure) 2025-09-10
73 Draft Revised “Guidelines for Model Quality Assurance Plan (MQAP) for major equipment of Power Sector” 2025-08-18
74 Draft Revised “Guidelines for the Type Tests for major equipment of Power sector” 2025-08-18
75 Inviting Comment on Draft Revised “Guidelines for the Type Tests for Major Equipment of Power Sector”, and Draft Revised “Guidelines for Model Quality Assurance Plan (MQAP) for Major Equipment of Power Sector” 2025-08-18
76 Extension of last date for submission of public comments on draft Central Electricity Authority (Measures relating to Safety and Electric Supply) (1st Amendment) Regulations, 2025 till 27.07.2025 2025-07-23
77 Filling up of 01 VACANCY of CANTEEN ATTENDANT ‘ and 01 VACANCY of Canteen CLERK by Direct Recruitment basis in the Departmental Canteen of CEA. 2025-07-14
78 CEA Guidelines for Automatic Weather Stations for Solar and Wind Power Plants 2025-07-07
79 Safety Booklet-CEA, 2025 2025-06-30
80 Draft Central Electricity Authority (Measures relating to Safety and Electric Supply) (1st Amendment) Regulations, 2025 2025-06-19
81 Report of the Standing Committee of Experts on failure of EHV Transmission Line Towers failed during the Period from January, 2024 to December, 2024 2025-06-13
82 Invitation for CommentsSuggestions on identified Critical Imported Items and Support required for their Indigenous Development of such critical items– Reg..pdf 2025-06-11
83 Report of the National Workshop on RE integration through ESS (Phase-I) held on 08.05.2025 2025-06-05
84 ADVICE ON FGD TECHNOLOGY SELECTION FOR DIFFERENT UNITS SIZE (FROM 01st NOVEMBER 2024 ONWARDS) 2025-05-02
85 IIT Delhi Report, 2024: Study to survey ambient atmospheric SO2 concentrations in different category of cities based on their vicinity to thermal power plants (TPPs). 2025-05-02
86 Report of Standing Committee of Experts on Failure of 220 kV and above Voltage Class Substation Equipment failed between July 2023 to December 2024 2025-05-01
87 Seeking comments on ‘Draft Safety Audit Checklist’ in respect of Hydro Power Sector for monitoring the compliance of Central Electricity Authority (Safety Requirements for Construction, Operation and Maintenance of Electrical Plants and Electric Lines) (Amendment) Regulations, 2022 2025-05-01
88 Draft Central Electricity Authority (Technical Standards for Construction of Electrical Plants and Electric Lines) (1st Amendment) Regulations, 2025 2025-04-30
89 Clarification regarding co-locating Energy Storage systems with Solar Power Projects 2025-04-01
90 Issuance of “Guidelines on Unified Philosophy for Placement of Phasor Measurement Unit (PMU) in Indian Grid” 2025-03-20
91 Rescheduling of 1st Meeting of 21st Electric Power Survey 2025-03-06
92 Draft Central Electricity Authority (Installation and Operation of Meters) (5th Amendment) Regulations, 2025 2025-03-05
93 CEA Issues “Comprehensive guidelines for the usage and sharing of fiber cores of Optical Ground Wire (OPGW)/ Under Ground Fiber Optic (UGFO) Cable for power system applications.” 2025-03-05
94 Advisory on co-locating Energy Storage systems with Solar Power Projects to enhance grid stability and cost efficiency 2025-02-18
95 Advice on FGD technology selection for different units size 2025-02-18
96 Methodology for Capacity Credit of Generation Resources & Coincident Peak Requirement of Utilities Under Resource Adequacy Framework 2025-02-17
97 Procedure for verification of captive status of such generating plant, where Captive Generating Plant and its Captive User(s) are located in more than one state 2025-02-12
98 Guidelines for Benchmarking of Operation & Maintenance (O&M) Norms for Distribution Utilities 2025-01-30
99 Guidelines for Standardization and Interoperability in AMI Systems for End to End Communication between Smart Meter, HES and MDM 2025-01-16
100 Manual on Transmission Planning Criteria (With Amendment-I) 2025 2025-01-08
101 Background Note on alternative mechanism for implementation of Fuel and Power Purchase Adjustment Surcharge (FFPAS) under Rule14 (Timely recovery of power purchase cost by distribution licensee) of the Electricity (Amendment) Rules, 2022 2025-01-03
102 Outcome Document- Workshop on Monetization of Transmission Assets organised by Central Electricity Authority in collaboration with PFCCL, PGInvIT and NIIF on 06.12.2024 in New Delhi 2025-01-03
103 Minutes of 15th NPC meeting held on 14.11.2024 at Nagpur, Maharashtra 2024-12-23
104 Facilitating Broadband Expansion by Allowing Leasing of Fibres on OPGW 2024-12-02
105 Comments of CEA on CERC draft order dated 04.10.2024 regarding directions to power exchanges 2024-11-06
106 Notice & Agenda for 15th NPC Meeting to be held on 14.11.2024 at Nagpur Maharashtra 2024-11-06
107 Extension of deadline for submission of comments/suggestions on draft Discussion Paper titled “Methodology for Capacity Credit of Generation Resources & Coincident Peak Requirement of Utilities under the Resource Adequacy Framework” 2024-11-04
108 Draft Discussion Paper on Methodology for Capacity Credit of Generation Resources & Coincident Peak Requirement of Utilities under Resource Adequacy Framework 2024-10-18
109 Draft Central Electricity Authority (Procedure for Transaction of Business) (Amendment) Regulations, 2024. 2024-10-09
110 Notice for the 15th meeting of National Power Committee (NPC). 2024-10-07
111 Report of the Committee for calculation of reduction of Right-of-Way (RoW) width through technological options 2024-09-24
112 Draft calculation sheet for the report of the Committee for calculation of reduction of Right-Of-Way (ROW) width through technological options 2024-09-13
113 Regarding Government Employee Appliance Scheme on Energy Efficiency (GovEasEE) for promotion energy efficiency amongh employees of Central Government, Sate Government and Public Sector Enterprises. 2024-09-09
114 Report on Status of Metering in the Country as on 31st March, 2024 2024-09-02
115 Advisory for proactive and comprehensive monitoring of Transmission Lines to Ensure Safety 2024-08-30
116 Advisory for compliance of latest Relevant Standard 2024-08-29
117 Sanction of the competent authority is hereby conveyed to the engagement of the following retired officers as Consultant in CEA with effect form 02.09.2024 for a preiod of 6 Month. 2024-08-27
118 wd: Strict compliance of the provisions of Flag Code of India, 2002 [as amended in 2021 & 2022] and the Prevention of Insults to National Honour Act, 1971 -reg. 2024-08-20
119 Extension of last date for submitting suggestions / comments on Amendment-I to the Central Electricity Authority (Manual on Transmission Planning Criteria), 2023 2024-08-16
120 Draft Central Electricity Authority (Cyber Security in Power Sector) Regulations, 2024—Invitation for Public Comments 2024-08-16
121 Presentation on India as Single bidding zone 2024-08-16
122 India as a Single Bidding Zone 2024-08-16
123 Amendment in the Guidelines for Import/ Export (Cross Border) of Electricity, 2018 2024-08-16
124 Amendment-II to the Procedure for approval and facilitating Import/Export (Cross Border of Electricity) by the Designated Authority 2024-08-14
125 Minutes of the Meeting on 01.07.2024 (Monday) at 03:30 PM to discuss the matter referred by CERC in the Petition No. 132/MP/2024 – RIL vs. CTUIL and Ors. 2024-08-12
126 Minutes of the meeting taken by Chairperson, CEA on 26.07.2024 (Friday) at 11:00 AM to discuss the pending applications Wind Power Plants for CON-4 and FTC approval. 2024-08-08
127 Agenda for 21st Meeting of NCT 2024-08-05
128 Filling up of 01 Vacancy of Canteen Attendant (in PB-1, Grade Pay- 1800, Level-1) by Direct Recruitment basis in the Departmental Canteen of CEA. 2024-07-23
129 Notice inviting suggestions / comments on Amendment-I to the CEA (Manual on Transmission Planning Criteria), 2023 2024-07-19
130 Minutes of the 20th Meeting of National Committee on Transmission (NCT) 2024-07-17
131 Revised SOP for Early Warning System in Hydro Electric Projects 2024-06-24
132 Advisory for implementation of the BIS Standards and Quality Control Orders related to copper products and its alloys 2024-06-18
133 Testing of carbon fibre composite (CFC) core of HTLS conductors. 2024-05-21
134 Revised Guidelines for retirement & up-rating / de-rating of Generating Unit(s) 2024-05-17
135 Report on Finalisation of Opening and Closing time ranges of guide vane during turbine and pumping modes of operation in Pumped Storage Plants 2024-05-08
136 List of Net Meter Manufacturers 2024-04-16
137 Lineman Diwas Report -2024 2024-04-15
138 Clarification regarding GIS and Hybrid Switchgear type test validity for the Distribution sector 2024-04-08
139 Procedure for assessment of the Design Temperature for RE Plants in compliance to CEA (Technical Standards for Connectivity to the Grid) Regulations 2024-04-08
140 Sachet Magazine (Bilingual) 2024-04-04
141 Extension of deadline for submission of comments on Draft National Electricity Plan (Volume-II: Transmission) till15th April, 2024 2024-04-01
142 Advisory for implementation of the BIS Standards and Quality Control Orders related to aluminium ingots, wire rods and wires used for the manufacture of conductors / cables 2024-03-27
143 Minutes of the 18th Meeting of National Committee on Transmission (NCT) 2024-03-11
144 Agenda for the 18th Meeting of National Committee on Transmission (NCT) 2024-03-04
145 Minutes of the 14th Meeting of NPC held on 03.02.2024 at Bangalore 2024-02-27
146 Minutes of the 17th Meeting of National Committee on Transmission (NCT) –regarding 2024-02-20
147 Techno-Economic Analysis of Renewable Energy-Round the Clock (RE-RTC) Supply for Achieving India’s 500 GW Non-Fossil Fuel Based Capacity Target by 2030 2024-02-09
148 Seeking Comments on Draft guidelines for retirement & up-rating / de-rating of generating units-reg. 2024-02-02
149 Office Memorandum for Fees Schedule for Recognition of Training Institute, February 2024. 2024-02-02
150 Additional agenda for 14th NPC meeting to be held on 03.02.2024 at Bangalore 2024-01-30
151 Draft National Electricity Plan (Volume-II: Transmission) – Inviting inputs/comments/suggestions by 26th March 2024 2024-01-25
152 Draft Central Electricity Authority (Installation and Operation of Meters) Amendment Regulations, 2024—5th Amendment—Invitation of Public Comments—Last Date: 26.02.2024 2024-01-24
153 Report on Increasing the PLF of Pithead Coal Based Power Plants 2024-01-24
154 Tech Specifications- Net Meter for Solar Application- Static & Smart Meters (1Ph-3 Ph) 2024-01-23
155 Electricity Distribution Network Planning Criteria – CEA 2024-01-22
156 Agenda of the 17th meeting of National Committee on Transmission (NCT) 2024-01-19
157 Agenda of the 14th NPC meeting to be held on 03.02.2024 at Bangalore. 2024-01-16
158 Report on One Day Workshop for RE Developers of Rajasthan on 22.12.2023 at Jaipur, Rajasthan organized by CEA. 2024-01-15
159 Guidelines for Recognition of Training Institutes in the field of Distribution of Electricity including details of Training Curriculum for Engineers, Supervisors and Technicians January, 2024 2024-01-15
160 Guidelines for Recognition of Training Institutes in the field of Generation of Electricity including details of Training Curriculum for Engineers, Supervisors and Technicians January, 2024 2024-01-15
161 Guidelines for Recognition of Training Institutes in the field of Transmission of Electricity including details of training Curriculum for Engineers, Supervisors and Technicians January, 2024 2024-01-15
162 Statutory Guidelines for Training and Certification of Load Despatchers & Recognition of Training Institutes January, 2024 2024-01-15
163 Report on One Day Workshop for RE Developers of Rajasthan on 22.12.2023 at Jaipur, Rajasthan organized by CEA. 2024-01-01
164 Minutes of the 16th meeting of NCT 2023-12-27
165 Draft Procedure for Verification of the Captive Status of Generating Plants—Inviting Public Comments—Last Date of Submission extended up to 08.12.2023 2023-12-01
166 Compensation methodology for operating a Thermal (Coal) Generating unit below 55% Minimum Power Level 2023-11-28
167 Agenda for the 16th Meeting of National Committee on Transmission (NCT) –regarding. 2023-11-28
168 Advisory to ensure One Nation, One License for Electrical Contractors 2023-11-22
169 Report of the Committee to make recommendation on the issue of scheduling of DVC Generators 2023-11-20
170 Report on Reverse Charging of Grid from Batteries of Electric Vehicles 2023-11-08
171 Draft Procedure for Verification of the Captive Status of Generating Plants—Inviting Public Comments—Last Date of Submission—01.12.2023 2023-11-01
172 Minutes of the Meeting held on 13.10.2023 to discuss non-compliances of CEA (Technical Standards for connectivity to the Grid) Regulations by RE developers by 30.09.2023 2023-10-20
173 Note on the Clarification of GIS and Hybrid GIS –Distribution Switchgear (33 kV, 22 kV & 11kV) 2023-10-20
174 Minutes of Meeting held on 23.08.2023, 06.09.2023 and 25.09.2023 to discuss compliance of CEA (Technical Standards for Connectivity to the Grid) Regulations 2023-10-10
175 Minutes of Meeting held on 29.08.2023 to discuss operational issues w.r.t. new STATCOMs at ISTS in RE complexes 2023-10-10
176 Minutes of the Meeting held on 13.09.2023 to discuss issues related to pending CON-4/ First Time Charging (FTC) applications of RE developers 2023-10-10
177 Guidelines for Slope Stability in Hydro Power Projects 2023-10-09
178 National Seminar under Mission LiFE on“ 6 Point Understanding of Climate Change & Corrective Actions” on 10th October 2023 at 5.30 P.M – 7.00 P.M (Online) by NPTI 2023-10-09
179 Constitution of Standing Technical Committee to study the issues in the event of any geological surprise faced in the Hydroelectric Projects 2023-09-25
180 Anticipated Energy Requirement and Peak Demand for FY 2024-25 2023-09-22
181 Minutes of the 15th Meeting of National Committee on Transmission (NCT) –regarding. 2023-09-18
182 Revised Guidelines for Qualifying Requirements for Bidders of Balance of Plant for Coal/Lignite based Thermal Power Stations 2023-09-04
183 Submission of Safety Audit Reports as per Central Electricity Authority (Safety Requirements for Construction, Operation and Maintenance of Electrical Plants and Electric Lines) (Amendment) Regulations, 2022- reg. 2023-09-04
184 Agenda for the 15th meeting of National Committee on Transmission 2023-08-21
185 Growth of Electricity Sector in India (1947-2023) 2023-08-18
186 Minutes of the 13th Meeting of NPC held on 05.07.2023 at Kolkata 2023-08-02
187 Amendment-1 to the Procedure for approval and facilitating Import/Export (Cross Border) of Electricity) by the Designated Authority 2023-07-31
188 CEA Committee Report on Requirement of Variable Speed machine vis-a-vis Fixed Speed machine in PSPs 2023-07-28
189 Guidelines for Medium and Long Term Power Demand Forecast 2023-07-27
190 All India Electricity Statistics – General Review-2023 2023-07-27
191 Revision in methodology for calculation of AT&C losses 2023-07-12
192 Minutes of the 14th meeting of National Committee on Transmission (NCT) 2023-07-07
193 GUIDELINES ON DESIGN, CONSTRUCTION, O&M and ANNUAL CERTIFICATION of COAL ASH PONDS 2023-06-28
194 Notice-Reschedule of 13th National Power Committee(NPC) Meeting to 5th July 2023 2023-06-28
195 Notice inviting suggestions / comments on Draft Paper on reconductoring of Transmission Lines in ISTS 2023-06-27
196 Operation and Maintenance (O&M) guidelines and Standard Format for Memorandum of Understating between New TSP and Existing TSP 2023-06-23
197 Notice/Agenda for the13th meeting of National Power Committee(NPC)-Scheduled to be held on 07.07.2023. 2023-06-21
198 Guidelines for Field Efficiency Test in Hydropower Plants (including Pumped Storage Projects) 2023-06-20
199 Vacancy Circular for filling up of 02 Vacancies 01 of CANTEEN ATTENDANT, in Level-1, (Rs.18,000-56,900) by DIRECT RECRUITMENT BASIS and 01 vacancy of ASSISTANT HALWAI-CUM-COOK, in Level-2 (Rs.19,900-63,200) BY DEPUTATION / DIRECT RECRUITMENT BASIS in the Departmental Canteen of CEA 2023-06-16
200 Central Electricity Authority (Measures relating to Safety and Electric Supply) Regulations, 2023 2023-06-16
201 Agenda for the 14th meeting of National Committee on Transmission (NCT) 2023-06-06
202 Minutes of the meeting held on 18.05.2203 regarding compliance of of CEA ( Technical Standards for Connectivity to Grid) regulations 2023-06-01
203 Compliance of CEA ( Technical Standards for Connectivity to Grid) regulations by RE developers letter dtd 12.05.2023 2023-06-01
204 National Electricity Plan-Vol-I: Generation(Notified vide Extra ordinary Gazette No. 3189, SI. No. 329,under part-III, Section IV dated 18.05.2023) 2023-05-31
205 Approved Revised Guidelines for Model Quality Assurance Plan (MQAP) for Major Equipment used in Power Distribution Sector 2023-05-29
206 Minutes of the 13th meeting of National Committee on Transmission (NCT) 2023-05-19
207 Agenda for the 13th Meeting of National Committee on Transmission (NCT) 2023-05-10
208 MoU between CEA and TERI 2023-05-10
209 Inviting Public Comments on Draft Modification-Model Quality Assurance Plan (MQAP) for Major Equipment in Thermal Power Plant 2023-05-08
210 Report on Optimal Generation Capacity Mix for the year 2029-30 (Version 2.0) 2023-05-04
211 Nationwide Monthly Webinar Series – Anubhav Awardees Speak 2023-04-27
212 Holding of Nation – wide Pension Adalat, on 17th May, 2023, Nominatoin of Officers – Regarding 2023-04-27
213 Minutes of the 12th meeting of NCT 2023-04-12
214 Inviting Public Comments – Guidelines for Medium and Long Term Power Demand Forecast 2023-04-11
215 POWER GLOSSARY 2023-04-10
216 SOP & Training Curriculum at 55% MTL 2023-03-24
217 Agenda for the 12th Meeting of National Committee on Transmission (NCT) –regarding 2023-03-21
218 MoU between CEA and IIT Delhi, March 2023 2023-03-21
219 Procedure for Shifting of Transmission Lines involving in work by other Infrastructure Developers 2023-03-21
220 Guidelines and Best Practices for O&M of Distribution Transformers 2023-03-17
221 Manual on Transmission Planning Criteria, 2023 2023-03-13
222 Hon’ble Minister of Power launches a Report on Flexibilisation of Coal Fired Power Plant: A Roadmap for Achieving 40% Technical Minimum Load 2023-03-03
223 Inviting Public Comments – Revised Guidelines for Model Quality Assurance Plan (MQAP) for Distribution Sector 2023-02-21
224 Growth of Electricity Sector in India (1947-2022) 2023-02-17
225 All India Electricity Statistics – General Review-2022 2023-02-17
226 Draft Central Electricity Authority (Construction of Electric Lines in Great Indian Bustard Area) Regulations, 2023 for inviting public/stakeholders comments (Last date 3rd March, 2023) 2023-02-01
227 Central Electricity Authority (Flexible Operation of Coal based Thermal Power Generating Units) Regulations, 2023 2023-01-31
228 Disaster Management Plan (DMP) 2022 for Power Sector 2023-01-09
229 Statistics/Data for Micro Grids and Mini Grids 2023-01-06
230 CDM – CO2 Baseline Database (Version 18.0) 2023-01-04
231 Central Electricity Authority (Technical Standards for Construction of Electrical Plants and Electric Lines) Regulations, 2022 2023-01-04
232 Minutes of Meeting held to discuss the issue of provisions regarding the Nitrogen Injection System for Transformers /Reactors as covered in the CBIP Manual on Transformers. 2022-12-28
233 Agenda for 11th meeting of NCT 2022-12-26
234 Transmission Plan for Integration of over 500 GW Non-fossil capacity by 2030 2022-12-15
235 Minutes of the 10th meeting of National Committee on Transmission (NCT) 2022-12-12
236 Extension of deadlines for submission of comments on Draft National Electricity Plan(Vol I Generation) till 15th December 2022. 2022-12-08
237 Extension of deadlines for submission of comments on Draft National Electricity Plan(Vol I Generation) till 15th December 2022 2022-12-05
238 Draft National Electricity Plan (Vol I Generation)-inviting comments by 5th December 2022 2022-12-01
239 Report on 20th Electric Power Survey (EPS) of India (Volume-I) 2022-11-21
240 Central Electricity Authority (Safety Requirements for Construction, Operation and Maintenance of Electrical Plants and Electric Lines) (Amendment) Regulations, 2022 2022-11-18
241 Minutes of the 12th NPC meeting held on 17th October 2022 2022-11-15
242 Strengthening the Central Secretariat Cadre management System (CSCMS) portal by up-dating the data of employees of CSS,CSSS and CSCS Cadres and to enable online Cadre Management &delivery of services to these cadres-reg 2022-11-03
243 Continuation of existing applications hosted on local IP 10.23.171.47 – reg. 2022-10-31
244 Awareness Lecture on “Sexual Harassment of Women at Workplace and related procedures in CEA 2022-10-28
245 Ease of Doing Business (EoDB) Reducing Regulatory Compliance Burden 2022-10-28
246 Activities to be conducted in CEA during Vigilance Awareness Week, 2022 (from 31.10.2022 to 06.11.2022). 2022-10-27
247 Login to newly developed intranet portal – reg. 2022-10-26
248 Regulatory Affairs Division As Coordination division for all Regulations 2022-10-25
249 Vacancy Circular – Filling up the post of Chief Estate Manager & Meeting Office in Level 11 in UPSC 2022-10-19
250 List of stations not sent monthly environment data for month of august-2022 2022-10-03
251 Meeting Notice/Agenda for 12th National Power Committee-Scheduled to be held on 14.10.2022. 2022-10-03
252 Draft Resource Adequacy Guidelines-inviting stakeholders’ comments by 15th October,2022 2022-09-28
253 Agenda for the 9th Meeting of National Committee on Transmission (NCT) – regarding 2022-09-27
254 Amendment in CEA (Cyber Security in Power Sector) Guidelines, 2021-reg 2022-09-22
255 Special Campaign 2.0 for disposal of Pending Matters from 02, October, 2022 to 31 October, 2022 – regarding. 2022-09-13
256 Draft National Electricity Plan (Vol I Generation)-inviting comments by 5th December 2022 2022-09-09
257 VACANCY CIRCULAR (Filling up of the post of Director General ) CPRI 2022-08-29
258 Weeding out of old records – during campaign period ( 16th August, 2022 to 15th November, 2022) as per precursor to Vigilance Awareness Week 2022. 2022-08-24
259 Updation of Manual on Procurement of Goods, Services, Works and Consultancy, etc. – Regarding. 2022-08-22
260 IIT Delhi Study Report on FGD Implementation 2022-08-18
261 Minutes of Special Meeting of NPC held on 24.06.2022. 2022-07-29
262 Cancellation of OM dated 14.07.2022 regarding purchase proposals of Sub-Offices of CEA 2022-07-27
263 cancellation of OM dtd 14.07.2022 regarding purchase proposals of Sub-Offices of CEA 2022-07-22
264 Committee formation for assessment of flexible power and ramp rate to be required in the year 2030 for integration of 500 GW RES – reg. 2022-07-21
265 Submission of Purchase proposal by Sub-Offices-Reg. 2022-07-15
266 Technical Specification of IEM, AMR and MDP system for ISTS 2022-07-13
267 Draft Central Electricity Authority (Flexible operation of thermal power plants) Regulations, 2022 2022-07-07
268 Standard Technical Specification For Steel Monopole Structure For AC Transmission Line 2022-07-04
269 Compliance of the provisions of Rule 4 of the Central Civil Services (Conduct) Rules, 1964 relating to employment of near relatives of Government servant in private companies or firms 2022-07-04
270 Submission of application on NSWS portal seeking authorization under section 164 of Electricity Act, 2003 2022-06-27
271 Revised Categorization of Thermal Power Units by Taskforce (CPCB) 2022-06-27
272 Suggestions for Logo of CSIRT-Power 2022-06-23
273 Technical Specifications for Bird Flight Diverter(BFD) issued by SC Committee in consultation with Central Electricity Authority -Reg. 2022-06-17
274 CEA’s site visit report for 400 kV D/C Twin Moose Sambha – Amargarh Transmission Line of INDIGRID on 17.11.2021 2022-06-17
275 Draft Manual on Transmission Planning Criteria, 2022- for comments of stakeholders (Last date 30th June,2022) 2022-06-16
276 Draft Manual on Transmission Planning Criteria, 2022- for comments of stakeholders (Last date 30th June,2022) 2022-06-16
277 Draft Central Electricity Authority (Measures relating to Safety and Electric Supply) Regulations, 2022- for inviting public/stakeholders comments ( Last date 28th July, 2022) 2022-06-10
278 Draft Central Electricity Authority (Measures relating to Safety and Electric Supply) Regulations, 2022- for inviting public/stakeholders comments ( Last date 28th July, 2022) 2022-06-10 ---
279 Draft Central Electricity Authority (Measures relating to Safety and Electric Supply) Regulations, 2022- for inviting public/stakeholders comments ( Last date 28th July, 2022) 2022-06-10
280 Seminar/Interaction on Technological Trends in various aspects of Hydro Power Development 2022-05-27
281 Request for Year wise and Project wise details of Funds released to Discoms/States in Distribution Sector in implementing PSDF schemes across the Country-reg. 2022-05-10
282 Manual of Communication Planning in Power System Operation-31.03.2022 2022-05-05
283 First amendment to Technical Specifications for Bird Flight Diverter(BFD) 2022-05-02
284 Clarification regarding Clause 3(j) of Guidelines for the Type Tests for Major Equipment in Power Sector wrt PQ tests 2022-04-29
285 Draft Central Electricity Authority (Furnishing of Statistics, Returns and Information) Regulations, 2007 2022-04-27
286 Request for clarification on the data of rural and urban HHs electrification submitted by BEST (April, 2020-March, 2021) 2022-04-27
287 Request for clarification on the data of rural and urban HHs electrification submitted by BEST (April, 2020-March, 2021) 2022-04-27
288 Clarification of data for rural and urban household electrification–submitted by BSET (April2020-march, 2021) -Reg. 2022-04-26
289 Request to furnish year wise details of CAPEX Data in Distribution Sector (66kV,33kV and below) from end of 12th plan to 2020-21-Reg. 2022-04-26
290 Central Electricity Authority (C.E.A) Annual Report 2021-22 – reg 2022-03-31
291 Compliance of Orders issued by Government of India in respect of Make in India (MII) initiative 2022-03-16
292 Guidelines for the Type Tests for Major Equipment in Power Sector 2022-03-14
293 Guidelines for Model Quality Assurance Plan (MQAP) for major equipment of Power Sector 2022-03-14
294 Constitution of committee on Ease of doing Business-Rsducing Regulatory Burden-regarding 2022-03-10
295 Constitution of committee on Ease of doing Business-Rsducing Regulatory Burden-regarding 2022-03-10
296 Information regarding Online submission of application for Prior approval under section 68(1) of Electricity Act, 2003 2022-03-03
297 Login to newly developed intranet portal and profile updation by CEA / RPCs Officers / staffs – regd. 2022-02-17
298 Baseline Carbon Dioxide Emission Database Version_17 2022-02-09
299 Guidelines for exemption/relaxation from mandatory co-firing of Biomass by Thermal Power Plants 2022-02-04
300 Uploading of data in web based software (POLLING PARTY MASTER ) Personnel Information System 2022-02-03
301 First Indian Technology Catalogue (Generation and Storage of Electricity) 2022-02-03
302 Circulation of Guidelines for Model QAPs for equipment of Substations, Switchyards and Transmission Lines – inviting comments/ suggestion 2022-01-05
303 Guidelines for Type Test Validity and Model QAP for Distribution Sector 2022-01-04
304 Draft Guidelines for Type Tests validity of Electro-Mechanical Equipment and Draft Guidelines for Model Quality Assurance Plan (MQAP) for major Electro-Mechanical Equipment in Thermal Power Sector – for Stakeholder(s) comments 2022-01-04
305 Circulation of Guidelines for Model QAPs for major Electrical & Mechanical (E&M) equipment in Hydro Power Sector – inviting comments/ suggestions -reg. 2022-01-04
306 Submission of Immovable Property Return (IPR) for the year 2021 (as on 31.12.2021) by the Officers of CSS cadre – Regarding. 2022-01-04
307 Circulation of Guidelines for Type Test validity period of major Electrical & Mechanical (E&M) equipment in Hydro Power Sector – inviting comments -reg. 2022-01-04
308 CEA Annual Report 2020-21 2021-12-31
309 Draft Central Electricity Authority (Technical Standards for Construction of Electrical Plants and Electric Lines) Regulations, 2021”for inviting the public comments 2021-12-30
310 Draft Central Electricity Authority (Safety Requirements for Construction, Operation and Maintenance of Electrical Plants and Electric Lines) Amendment Regulations, 2021 -inviting public comments 2021-12-30
311 Draft Indian Standards on mass consumption products/consumer goods and need for issuance of Quality Control Order (QCO) 2021-12-30
312 Final Report of the Task force for Categorization of Thermal Generating Units 2021-12-20
313 Draft Indian Technology Catalogue 2021-12-10
314 Formats proposed for deletion and the draft formats proposed for modification of “Central Electricity Authority (Furnishing of Statistics, Returns and Information) Regulations, 2007” 2021-11-02
315 CEA (Cyber Security in Power Sector) Guidelines, 2021 2021-10-07
316 Upsation of Central Public Information Officers (CPIOs) and Appellate Authorities (AAs) of CEA (HQ) and its Subordinate Offices Reg 2021-10-04
317 Constitution of a Committee in CEA to suo moto scrutinize tenders floated for Public Procurement having value Rs. 500 crores and above. 2021-09-30
318 Amendment No. 1 to “Standard Specifications and technical Parameters for Transformers and Reactors (66 kV & above voltage class) 2021-09-23
319 Amended CEA’s Guidelines for the Validity Period of Type Test(s) conducted on Major Electrical Equipment in Power Transmission System (Issued on 17.09.2021) 2021-09-21
320 Extension of validity date of Type Test Certificate up to 30.09.2022 and amendment to CEA’s “Guidelines for the Validity Period of Type Test(s) conducted on Major Electrical Equipment in Power Transmission System (Issued on 17.09.2021) 2021-09-21
321 Executive Summary-Jun-21 2021-09-20
322 Executive Summary – Jun-21 2021-09-20
323 Unit_wise_FGD_implementation_status_and_summary_sheet_for_August_2021 2021-08-10
324 सोलर पार्क पूलिंग स्टेशन के लिए पावर ट्रांसफॉर्मर के मानक तकनीकी विनिर्देश 2021-06-23
325 Standard specification for power transformer for solar park pooling station 2021-06-23
326 Baseline Carbon Dioxide Emission Database Version 16.0 2021-06-21
327 Revised Standard Operating Procedure to deal with Intensive Examination carried out by Chief Technical Examiners’ Organization 2021-06-09
328 The Concept Paper on Insulated Cross Arm 2021-06-07
329 Submission of data for Annual Report of CEA for 2020-21 2021-05-28
330 Standard Specifications and Technical Parameters for Transformers and Reactors (66 kV & above voltage class) 2021-04-29
331 Invitation of comments on draft Standard Technical Specification for Steel Pole Structure 2021-04-24
332 Approval of the Competent authority is hereby conveyed for constitution of computer screening & Purchase Committee (CSPC) in CEA (HQ) 2021-04-22
333 Launching of India RE Dashboard 2021-04-20
334 Details Regarding vaccination of employees of organization under Mop 2021-04-19
335 Market Monitoring Cell Annual Report 2019-20 2021-02-04
336 List of Deemed Licensees under SERCs/ JERCs in the country 2021-02-04
337 Request for providing data/information for HHs electrification/Domestic Connection by Discoms / Power department 2021-02-01
338 Reminder letter for providing data/information for HHs electrification/Domestic Connection by Discoms / Power department 2021-02-01
339 Technical Specifications for Bird Flight Diverter 2021-01-29
340 Disaster Management Plan for Power Sector- January 2021 2021-01-25
341 Notice for prospective eligible bidders to submit its details to CEA for coal linkage auction by CIL under Para B(viii)(a) covering Para B(iii) for the Quarter April to June, 2021 2021-01-21
342 Guidelines For Renovation & Modernisation Life Extension Works Of Coal lignite Based Thermal Power Stations 2020 2020-12-21
343 Review of environmental norms- Plant location specific emission standards for Thermal Power Plant 2020-12-21
344 Quarterly Review Report Renovation & Modernisation of Thermal Power Stations (Sept.,2020) 2020-12-21
345 Plant wise details of under construction Renewable Energy Projects and Associated Transmission Network 2020-09-25
346 Formats for Annual Generation Program for FY. 2021-2022 2020-08-25
347 Letter for Furnishing Information for Annual Generation Program for FY. 2021-2022 2020-08-21
348 The report on 19th Electric Power Survey of India (Volume III) part-II (Mega Cities) 2020-08-18
349 Constitution of a committee for independent verification of self-declarations and auditor’s / accountant’s certificates on random basis and in the case of complaints 2020-08-17
350 Guidelines for the Validity Period of Type Test (s) conducted on Major Electrical Equipment in Power Transmission System 2020-07-31
351 Establishment of standardization cell in CEA 2020-07-30
352 GUIDELINES FOR AVAILABILITY OF SPARES AND INVENTORIES FOR POWER TRANSMISSION SYSTEM (TRANSMISSION LINES & SUBSTATION/SWITCHYARD) ASSETS 2020-07-28
353 Notice to invite details from eligible bidders for coal linkage auction by CIL under Para B(viii)(a) covering Para B(iii) for the Quarter October-December,2020 2020-07-14
354 Notice for submission of Monthly RE generation data in revised format 2020-06-25
355 REPORT OF STANDING COMMITTEE OF EXPERTS ON FAILURE OF 220 kV & ABOVE VOLTAGE CLASS SUBSTATION EQUIPMENT (APRIL 2018-MARCH 2019) 2020-06-25
356 REPORT ON OPTIMAL GENERATION CAPACITY MIX FOR 2029-30-FINAL 2020-06-07
357 Notice to invite details from eligible bidders for coal linkage auction by CIL under Para B(viii)(a) covering Para B(iii) for the Quarter July-September,2020 2020-06-02
358 Data Visualisation Page is being created for sharing data with stakeholders 2017-12-31
359 Load Generation Balance Report 2016-17 – Revised (Due to an inadvertent error noticed in data entry, LGBR for the year 2016-17 has been revised) 2016-06-17
360 Workshop on “Coordinated Power Demand Forecasting and Procurement Planning : Enabler for 24 x 7 Power Supply” 2016-06-11
361 Distribution of Letter of Appreciation to employees of Ministry, PSUs & Organisations/Satatutory Bodies under Ministry of Coal, Power & NRE 2016-06-05
362 Highlights of 2nd National Workshop on Electrical Safety 2016-04-12
363 Highlights of Brain Storming Session of 19th Electric Power Survey (EPS) held on 29th May 2015 2015-05-29
364 Launching of CEA Clearance Web Portal 2015-03-18
365 Joint CEA-ICA India One-day National Workshop on Electrical Safety at New Delhi 2015-02-10
366 Material on important works/achievements or any new development pertaining to F&CA Divisions of CEA 2014-02-24