Civil Design Division - Brief Description
Chief Engineer : Shri Rajeev Singhal
B) CIVIL DESIGN MATTERS
Design review of civil portion of Electro-mechanical (E&M) package of Hydro/Thermal PowerPlants and Power Transmission systems
C) COST MATTERS
Appraisal of cost of Civil & Hydro-Mechanical (HM) works of Hydro Electric Projects (HEPs)including renovation, modernization and uprating (RMU) along with life extension of theHEPs; pumped Storage Projects at following stages as per respective CEA guidelines (afterfinalization of Design and drawings from CWC):
1) At DPR stage: Examination and vetting of bill of quantities (BoQs); vetting of constructionschedule; phasing of cost after finalization of cost from CWC; in principle approval forreimbursement of cost of Enabling infrastructure (roads, bridges, land etc); in principle approval forreimbursement of cost of flood moderation etc.
2) At PIB/DIB (Public Investment Board/ Delegated Investment Board) stage: Cost up-dation & vetting of cost of pre-construction activities.
3) At construction stage: Vetting of reimbursements claim of cost of Enabling infrastructure(Roads, Bridges, Land etc); reimbursements claim of cost of Flood moderation; revised costestimate etc.
4) At project completion stage: Examination and vetting of Cost Estimate at completion level;In case of Memorandum of Changes (MoC) at RCE stage, vetting of revised BoQs, constructionSchedule and phasing of balance and executed Civil & HM Works.
Civil Design Division - Other Reports
Guidelines for coal or lignite based TPPs to utilize ash by providing it to the ‘user agencies’ as stipulated in the MoEF&CC Notifications dated 31.12.2021 and subsequent amendments
GUIDELINES ON DESIGN, CONSTRUCTION, O&M and ANNUAL CERTIFICATION of COAL ASH PONDS
Guidelines for preparing the civil cost estimates of transmission system project
Reduction in cost of civil works of tpp as suggested by the review committees of experts constituted in CEA